Consumer units

Consumer unit and fuse-board replacement

A consumer unit swap brings your fuse board up to the current standard — RCD protection on every circuit, arc-fault detection where required, and a proper certificate for your file. Most straightforward domestic consumer-unit replacements are completed within a day. More complex work, including three-phase installations, may take longer. We’ll discuss the expected duration when assessing the job.

Based in Tain, serving Ross-shire, Inverness and the wider Highlands.

How we price board changes

Priced per property, quoted before we start.

Consumer unit upgrades depend on the number of circuits and how tidy the existing tails and meter position are. An older Wylex or Crabtree in an awkward cupboard takes longer than a straight swap. We fit one spec of board — full RCBO with surge protection — so what you pay is based on the job in front of us, not on cutting corners with the kit.

Ring us and describe what you've got (or send a photo of the current board on WhatsApp) and we'll give you a price for the agreed scope on the phone, including any travel costs. Full BS 7671 test after the swap, report provided following testing and checks.

Hager gear as standard — proper warranty, parts always available. Ring Kelvin on 07954 350 931.

What you get

Scope and costs explained before we attend.

  • Full circuit test before we start — we know what we're plugging into.
  • Isolation notice served to SSEN if we need the meter pulled.
  • New tails from the meter to the board if the existing ones are undersized.
  • Main earth checked and upgraded to 16mm² where needed.
  • Bonding to gas, water and any other services checked.
  • Every circuit re-tested and re-labelled after the change.
  • Reports and certificates are provided for the work carried out.

When your board needs changing

Not every old board needs replacing. Common signs that yours does:

  • Wylex 'Standard' with the black fuse carriers (pre-1990s, no RCD protection).
  • MEM 'Memera' or MK 'Sentry' from the 80s — usually no RCDs, often no space to add them.
  • Plastic-bodied unit fitted before 2016 — the current rules require metal (or non-combustible) enclosures in domestic settings.
  • Repeated nuisance tripping on a single RCD — usually the sign that too many circuits are stacked behind one RCD.
  • Any burn marks, browning around the busbar, or that distinctive plasticky smell.

Why we only fit full RCBO boards with SPD

A dual RCD board splits your circuits across two 30mA RCDs. When a fault trips one, half the house goes off — lights, sockets, fridge, freezer, everything on that side. Fine on paper, a nightmare in practice, especially if you're not there when it happens.

A full RCBO board has one RCBO per circuit. If a fault trips one circuit, only that one circuit goes off. Everything else keeps running. The freezer stays cold. The heating stays on. The Wi-Fi stays up. If it's a holiday let and a guest trips the shower circuit, they've still got lights and sockets and can ring you — not sitting in the dark on a Sunday night.

Costs a bit more up front. Saves you money the first time a fault happens — no lost freezer, no lost let, no emergency callout to reset an RCD from 60 miles away. That's why every board we fit is full RCBO. No dual RCD, no split-load. One spec, done properly.

Every board also gets an SPD (Surge Protective Device) as standard. It clamps voltage spikes from lightning, grid faults and switching events — which the Highland grid throws at you more often than most people think. Cheapest bit of insurance in the whole install.

Common questions

Straight answers, no waffle.

How long does it take?

Most straightforward domestic consumer-unit replacements are completed within a day. More complex work, including three-phase installations, may take longer. We’ll discuss the expected duration when assessing the job.

Will you need to lift floorboards?

Usually no — we're working at the board itself. If a circuit turns out to be faulty during the pre-test we might need to trace it back, which can mean lifting a board. We'll always tell you before we lift anything.

Can I keep my old board as backup?

No — it has to come out. But we'll take it away and dispose of it properly (the copper busbars are actually recyclable).

Do I need a warrant?

No. Consumer unit replacement is exempt work in Scotland. You still need a competent person to do it and an EIC to close it out — but no council application.

Ready when you are

Request a quotation

Tell us what's in front of you. We’ll get your quotation to you as soon as possible.

Call us WhatsApp Text us