Building warrants

Electrical work for Scottish building warrants

When you're extending, converting a loft, splitting a house, or changing use, Highland Council building standards need to see that the electrical work meets current standards before they'll sign off the completion certificate. We do the electrical scope and hand you the paperwork.

Based in Tain, serving Ross-shire, Inverness and the wider Highlands.

How we price warrant work

Priced per project, quoted after a look at the drawings.

Warrant work is designed around your drawings and the surveyor's requirements — extension, loft conversion, change-of-use split, or a new-build. Every job is unique.

Send us the drawings (email or WhatsApp is fine) and we'll come out for a site look, talk through the electrical design, and come back with a fixed price. Electrical work is carried out in accordance with BS 7671 and the applicable Scottish building-warrant requirements, with the relevant electrical certification provided.

Ring Kelvin on 07954 350 931.

What you get

Scope and costs explained before we attend.

  • Design compliant with BS 7671 (18th Edition) and Scottish Building Standards.
  • Fully coordinated with your builder and the SER-appointed structural engineer if any.
  • Certificate of compliance for Highland Council building standards.
  • EIC (Electrical Installation Certificate) for the new work.
  • Updated EICR for the existing installation where the warrant requires it.
  • Photos and test results kept for 7 years — for you, for the council, for any future sale.

Where the electrical scope sits in a warrant

Scottish Building Standards is a functional-standards regime — Technical Handbook Section 4 covers safety, and Chapter 4.5 covers electrical safety. It defers to BS 7671 (the wiring regs) for the technical detail. What the council actually inspects at completion is:

  • That a competent person did the work.
  • That a valid EIC has been issued for the new circuits.
  • That any existing installation affected by the work has been re-tested and remains safe.
  • That the smoke, heat and CO alarm coverage meets the current Scottish standard.

What we do on a typical warrant job

Once we've had the builder's drawings we'll price the electrical scope as a fixed lump-sum. We attend on the first-fix (cables and back-boxes in before plasterboard), then on the second-fix (accessories, board work, testing). We stay in touch with the building control officer if any queries come up.

At completion we hand over: EIC for the new work, updated EICR for the existing installation if we've had to touch it, alarm certificate, and a folder of test results. Everything the council needs to sign the completion certificate.

Change-of-use is where it gets fiddly

Splitting a farmhouse into two dwellings, converting an outbuilding into a holiday let, turning a shop into a flat — these are change-of-use warrants and they usually trigger a full electrical upgrade for the affected part of the building. In practice that means a new sub-main from the meter, its own consumer unit, RCD protection on everything, dedicated smoke/heat alarm system for the new dwelling. We've done a fair few of these in Tain and around Dingwall — happy to talk through what your specific building will need before you commit to the warrant.

Common questions

Straight answers, no waffle.

Do I need a warrant for a consumer unit swap?

No — a like-for-like consumer unit change on an existing installation is not warrantable work. You do still need an EIC from a competent person and (in most cases) an updated EICR.

What about a new circuit for an EV charger?

A single new circuit for an EV charger doesn't need a building warrant. It does need a notification to the DNO (SSEN in the Highlands) and an EIC on completion. See our EV charger page.

Can you work with my architect's drawings?

Yes. Send them over. We're used to reading Scottish warrant drawings and we'll flag anything that looks impractical or non-compliant before it hits the wall.

How far ahead do you book warrant work?

Usually 4-8 weeks depending on time of year. Winter warrant jobs are quieter than summer STL work, so if you're planning a January-March fit-out we can often move faster.

Ready when you are

Request a quotation

Tell us what's in front of you. We’ll get your quotation to you as soon as possible.

Call us WhatsApp Text us